The mattress was in the living room while we did our bedroom |
The living room then had to hold the stuff from the kitchen and laundry including the linen. |
The bedroom had the base and that was all. It is now painted and carpeted and stacked with stuff from other parts of the house. |
The kitchen was intact at this point although half the bedroom ended up in there along with all the laundry. |
The overflow from the storage shelves in the laundry ended up in William's present room. |
The hall got a fair amount of stuff too. Some of this will go in the new living room. |
James had all the spare bedding in his room. Then all of this had to go elsewhere as his room is next on the list. |
Windows for installation packed on the front veranda. |
The side wall where all the foundations had to be replaced as it was starting to look rather more like a banana than a wall. Can you tell we don't have a garage! |
Matt is replacing the bathroom window at this very moment with the double glazed one that should be good for mid winter heating problems. There are two more windows to go - one over the bathroom sink and one for the laundry. Both are double glazed but one has broken glass because the gale force wind from last week broke it loose and it fell on a tree stump.
James is living in the caravan I borrowed from my sister - it is a tiny retro one called Henrietta. Hopefully his sleep out will arrive in the next week or so.
And that's progress for this week!
viv